91ÖÆƬ³§

OUR WORK MATTERS.

Portfolio

DELAWARE WATER TREATMENT PLANT IMPROVEMENTS

Water Resources

DELAWARE WATER TREATMENT PLANT IMPROVEMENTS

This is one of only a few membrane plants in Ohio using both ground and surface water sources, making this project unique and complicated. The new system features three ultrafiltration skids and three pressure filters which pretreat and feed water from both raw water supply sources to five nanofiltration skids.
Client City of Delaware
Location Delaware, OH
Gallons of Water Per Day 7,100,000.00
Project Budget $30.2 Million
ALLEGHANY COUNTY OF VIRGINIA LOWER JACKSON REGIONAL WWTP

Water Resources

ALLEGHANY COUNTY OF VIRGINIA LOWER JACKSON REGIONAL WWTP

New 2.6 MGD enhanced nutrient removal wastewater treatment plant consisting of: Sludge Handling System, Headworks Building, Reactor Basins, Chemical Treatment, UV Disinfection, Effluent Filters, Clarifiers, Cloth Media Filter System, Laboratory / Control Building, Related Process Equipment, Piping, Electrical and Instrumentation Systems.
Client Alleghany County of Virginia
Location Eagle Rock, VA
MGD 2.60
Project Budget $14 Million
MASSILLON WASTEWATER TREATMENT PLANT EXPANSION

Water Resources

MASSILLON WASTEWATER TREATMENT PLANT EXPANSION

This project involved a comprehensive upgrade and expansion of the existing plants treatment process and capacity. The primary change in treatment process was the conversion of the existing aeration system to biological reactors using an Integrated Fixed Film Activation Slude process. Additional upgrades including new screw pumps at the headworks station, upgrades to the chemical feed system and a new 27MGD effluent pump station.
Client City of Massillon
Location Massillon, OH
MGD 42.50
Project Budget $27 Million
CITY OF SIDNEY WASTEWATER TREATMENT PLANT IMPROVEMENTS

Water Resources

CITY OF SIDNEY WASTEWATER TREATMENT PLANT IMPROVEMENTS

Upgrade to existing wastewater treatment facility to enhance wet weather capacity. The scope included modifications to existing wet weather basin for capacity and enhanced chemical feed system, new areation, new UV disinfection, rehabilitation of existing anaerobic digesters and a new standby power generator system to power the entire plant during an electrical service interruption.
Client City of Sidney
Location Sidney, OH
Square Footage
Project Budget $12 Million
ZANESVILLE WASTEWATER TREATMENT PLANT

Water Resources

ZANESVILLE WASTEWATER TREATMENT PLANT

This project included improvements to the primary treatment including two new grit collector tanks and grit dewatering, high-rate treatment mixing tank and chemical feed, rehabilitation of primary sludge pumping station and sludge drawoff well, new primary splitter box and of primary sludge pumping station and sludge drawoff well, new preimary splitter box and new 72’ diameter primary clarifier, and installation of new collector mechanisms in two each 72’ diameter primary clarifiers. Improvement to the secondary treatment included new solids contact tank and blower building, new 115’ diameter secondary clarifier, and new RAS/WAS pumping facility.
Client City of Zanesville
Location Zanesville, OH
Square Footage
Project Budget $27 Million
CITY OF CANTON WATER RECLAMATION FACILITY

Water Resources

CITY OF CANTON WATER RECLAMATION FACILITY

This project achieved compliance with enhanced EPA guidelines by converting the existing chlorine gas treatment process to a safer and more environmentally friendly sodium-hypochlorite process. The work involved significant demo to accommodate the new system and a highly phased approach to maintain operations throughout the project.
Client City of Canton
Location Canton, OH
MGD 88.00
Project Budget $45 Million

SAFETY

SAFELY, THE ONLY WAY TO WORK

Safety is the most important value in our company. It impacts everything we do and is the first consideration when we plan our work. Our motto says it all: Safely, the only way to work. Our entire team is passionate about ensuring that everyone onsite works safely and can return home at night.

Our award-winning safety program is designed to provide zero incidents, as well as a safe and healthy work environment for all of our employees, subcontractors and the general public. Our goal on every job is to ensure that all work is completed safely with appropriate tools, equipment and methods. This goal takes priority over project scheduling concerns.

Safety Icon